Rating
Blueprint Information
Description F5 Local Traffic Manager Physical Connectivity
Architect Russel Pham
Blueprint Verified By
Blueprint Certified By
Configuration Verified By
Configuration Certified By
Status Information
Industry All
Category Load Balancing
Revision 3
Date Submitted January 19, 2010
URL
Time/Cost
Estimated Hardware Cost
Estimated Software Cost
Estimated Configuration Time
Estimated Configuration Cost
Attachments
Attachments
    Additional Info
    Notes F5 Local Traffic Manager Physical Connectivity (redundant) Blueprint represents the best possible redundancy allowing to survive any single box or link failure in each layer.

    There are no comments, You must be logged in to post a comment.